Projects

Moura Mine

Moura Mine Tailings Dredging

Tailings Dredging at Moura Mine Overview of Project Neumann Dredging’s Nu-Endeavour was chosen to reclaim coal tailings from the Moura 2C pit. These tailings were processed to recover the fine coal lost in earlier operations and it was part of a program to empty the pit to enable ongoing mining underground from the pit floor.

Moura Mine Tailings Dredging Read More »

Penrith Lakes

Penrith Lakes Tailings Dredging

Tailing Dredging at Penrith Lakes Overview of Project The Penrith Lakes Scheme covers an area of just under 2,000 hectares, located in the Penrith Valley bounded by the Nepean River and the foothills of the Blue Mountains. The project involved dredging of approximately 1,300,000m3 of sand, silts and clays from a central tailings storage facility

Penrith Lakes Tailings Dredging Read More »

Port Botany

Port Botany Container Terminal

Capital Works dredging at the Port Botany Container Terminal Expansion Overview of Project Port Botany Container Terminal Expansion was a major infrastructure project for the Sydney Port Corporation on the North Eastern end of Botany Bay, South Sydney N.S.W. The project was for the expansion of the existing container port terminal and involved capital dredging

Port Botany Container Terminal Read More »

Port Kembla

Port Kembla Tug Berth Dredging

Tug Berth Dredging at Port Kembla Overview of Project Neumann Dredging were engaged as dredging contractors for McConnell Dowell for the dredging works to construct a new tug boat berthing area for Port Kembla. The new tug berth area is to protect the tugs from extreme weather conditions by the means of extended break water

Port Kembla Tug Berth Dredging Read More »

Superior Coal

Superior Coal Tailings Dredging

Tailings Dredging at Superior Coal Mine Overview of Project Neumann Dredging were engaged as Dredging Contractors to carry out the dredging works to clear a pond 150 meters wide, 650 meters long of coal tailings that washed in over several years. The coal tailings, ranging from fine silt to approximately 70mm in size, were pumped

Superior Coal Tailings Dredging Read More »

Chinderah Bypass

Chinderah Bypass Project

Chinderah Bypass Overview of Project It takes time to adapt to new regulations and methodologies; however, the Chinderah Bypass contract saw Neumann Contractors placed in a situation that required experience that was yet to be gained. No precedence had been set, so a sharp learning curve was essential. The Chinderah Bypass was a technically complex

Chinderah Bypass Project Read More »