Projects

Cullen Bay

Cullen Bay – Bhagwan Marine

Bhagwan Marine Dredge Hire in Cullen Bay Bhagwan Marine hired Neumann Dredging to design and build a 250mm cutter suction dredge, the Nu-Investigator and a 250mm booster station to complete 100,000m3 of maintenance dredging in the access channel to the Cullen Bay Ferry Terminal in Darwin.   To achieve the desired results, Neumann Dredging modified the

Cullen Bay – Bhagwan Marine Read More »

Canaipa Passage

Canaipa Passage Dredging

Canaipa Passage Maintenance Dredging The Gold Coast Waterway Authority commissioned Neumann Dredging to complete the dredging of 30,000m3 of sand from two areas from the Canaipa Passage in the Gold Coast Broadwater. We used Neumann Contractors’ designed and built 450mm cutter suction dredge the Nu-Endeavour to undertake the dredging works. As there was no access

Canaipa Passage Dredging Read More »

Ramsgate Baths

Ramsgate Baths Beach Nourishment

Beach Nourishment Works at Ramsgate Baths Bayside Council awarded Neumann Contractors the contract to dredge sand from Dolls Point to replenish the beach at Ramsgate Baths in Botany Bay NSW. Though Council requested tenders for a cutter suction dredge Neumann submitted a proposal to use a dry feed hopper bin arrangement to produce a slurry

Ramsgate Baths Beach Nourishment Read More »

Kinross Estate Banner

Kinross Business Park Stage 9

Resource Dredging at Kinross Business Park Overview of Project The Kinross Estate is an industrial park developed by the CABP Group Pty Ltd in Heatherbrae, NSW.  To develop the site, the final levels need to be elevated to above the forecast flood levels.  Previous stages were filled by conventional construction equipment with sand sourced from

Kinross Business Park Stage 9 Read More »

Bulga

Bulga Mine Dredge Trial

Dredge Trial at Bulga Mine Overview of Project Bulga Coal Management engaged Neumann Dredging to undertake a trial to determine the feasibility and confirm the design of the tailings delivery system for a significant coal tailings relocation project. Scope of Works The dredge trial scope included: Modifying the ‘Nu-Endeavor’ from an anchor boom and spud-controlled

Bulga Mine Dredge Trial Read More »

Liddell Power Station Dredging

Liddell Bottom Ash Dredging

Ash Dam Maintenance Dredging at LiddeLl Powerstation Overview of Project AGL Macquarie engaged Neumann Contractors to dredge coarse bottom ash (Clinker) from a temporary storage facility to a permanent storage location at the Liddell Power Station. Scope of Works The dredging works consisted of pumping approximately 130,000 m3 of bottom ash (clinker) a distance of

Liddell Bottom Ash Dredging Read More »

Hellyer

Hellyer Gold Dredge Hire

Tailings Pond Dry Hire Dredging at Hellyer Gold Mine Hellyer Gold Mines hired Neumann Contractors to design and build a 250 mm cutter suction dredge, the ‘Nu-Investigator’, for 12 months to supplement their existing operations dredge in the sites tailings ponds. The hire agreement was a dry hire arrangement with Neumann Contractors providing experienced operators

Hellyer Gold Dredge Hire Read More »