Project


Chinderah Bypass Project

Client:

Roads & Traffic Aurtority NSW

Location:

Tweed Heads, NSW

Completion:

Project Overview


It takes time to adapt to new regulations and methodologies; however, the Chinderah Bypass contract saw Neumann Contractors placed in a situation that required experience that was yet to be gained. No precedence had been set, so a sharp learning curve was essential.

The Chinderah Bypass was a technically complex project that required a combination of best management practices and the conception of new industry practices to achieve the desired end. Modifying the original concept during the construction phase through systematic scientific research and a touch of entrepreneurship has seen a potential environmental nightmare turned around to benefit both the contractor and the community.

Despite the difficulties faced during the project, Neumann Contractors completed the contract to the clients’ requirements on time and within budget.  A success worthy of winning the 1997 National Case Earth Award for demonstrating a commitment to innovation and best practice in the field of environment in civil construction.

Environmental Impact Studies (EIS) had concluded that increasing the waterway by removing sand would reduce the risk of flooding of adjacent low lying developed areas. Therefore the dredging of the River was part of a longer-term plan for the Chinderah Bypass area.

The dredging operation was to be conducted with strict control as the road traversed over 800m of tidal wetland, crossing three large tidal drains and areas that were considered environmentally sensitive.

To further complicate the situation, prior testing had revealed that existing soils in the road corridor had recorded a significant Acid Sulphate Potential.


Image
Image

Scope & Solution


Scope of Works

The scope of work included:

  • Importation by dredge of approximately 700,000m3 of fill,
  • Dredging of alluvial sand from the Tweed River directly to the road corridor,
  • Pollution mitigation measures relating to sand pumping operations,
  • Containment and treatment of dredge tailwater to meet EPA standards,
  • Containment and disposal of Acid Sulfate dredge residue.

Challenges

The dredging operation was to be conducted with strict control as the road traversed over 800m of tidal wetland, crossing three large tidal drains and the following areas that were considered environmentally sensitive:

  • Two separate coastal wetlands, including an area of mangroves,
  • A coastal dune area,
  • The only remaining rainforest section in the district contained a stand of endangered trees (Acronychgia litturalis).

How We Delivered


Innovations

There were many environmental challenges on the Chinderah Bypass; some of the methods for overcoming these were:

  • During the dredging process, the sand and silts separated within the slurry. At the dredge head, the sand separates, allowing the tailwater containing the acid sulphate silt to run to the lowest point. A secondary pumping system has been established to pump the tailwater and fines to a temporary sedimentation pond and treatment facility.
  • A water treatment facility with a 132,000m3 capacity was constructed on thirty-two hectares of land adjacent to the road’s corridor leased from a sugarcane farmer.
  • The final 75,000m3 of topsoil product was sold on the Gold Coast and won several significant supporters in the landscape industry.

Outcome

The Chinderah Bypass project was a great success for all those involved and became a valuable building block in the future treatment and management of acid sulphate soils. Neumann’s treatment of the ground has been the topic of several scientific publications, including the National Conference on Acid Sulfate Soil.

Throughout the contract, interested visitors to the site included:

  • ASSMAC Committee,
  • Department of Agriculture,
  • Department of Natural Resources,
  • Queensland and NSW Acid Sulfate Committees,
  • Federal Airports Commission,
  • Tweed Shire Council,
  • Gold Coast City Council.

Gallery


Image
Image
Image
Image

Looking Ahead


The Chinderah Bypass project was a great success for all those involved and became a valuable building block in the future treatment and management of acid sulphate soils. Neumann’s treatment of the ground has been the topic of several scientific publications, including the National Conference on Acid Sulfate Soil.

Image

Let’s Discuss Your Next Project


VIEW OUR OTHER PROJECTS


Image

Wynnum Road Widening

Image

Wacol Driver Training Facility

Image

Sunshine Coast Motorway Link Road

Image

Southwest 1 and Berrinba Wetlands

Image

Mount Lindesay Highway

Image

Maroochy Boulevard Interchange

Image

Kingscoast Estate Project

Image

Kawana Waters

Image

Kalimna

Image

Hope Island Road Duplication

Image

Exit 54 Pacific Motorway – Abraham Road

Image

Bribie Island Road Duplication

Image

Beenleigh Redland Bay Road Upgrade

Image

Gold Coast Convention Centre

Image

Ernest Henry Mine Tailings Dredging

Image

Lake Illawarra Channel Entrance Dredging

Image

Cadia Gold Mine Tailings Dredging

Image

Moura Mine Tailings Dredging

Image

Penrith Lakes Tailings Dredging

Image

Port Botany Container Terminal

Image

Port Kembla Tug Berth Dredging

Image

Superior Coal Tailings Dredging

Image

Sydney Water Desalination Project

Image

GPC – Tug Berth & Channel Dredging

Image

Tallebudgera & Currumbin Creeks Dredging

Image

Townsville Marine Project

Image

Corridor Sands Resource Dredging

Image

Corrie Channel Dredging

Image

Cullen Bay – Bhagwan Marine

Image

Currumbin Creek Annual Dredging

Image

Liddell Power Station Fly Ash Dredging

Image

Hellyer Gold Dredge Hire

Image

High Quality Sands – Coffs Harbour

Image

Iluka Boat Harbour Dredging

Image

Cudgen Lakes Resource Dredging

Image

Liddell Bottom Ash Dredging

Image

Maroochy Dredging Beach Nourishment

Image

Maroochy Replenishment Dredging

Image

Monreagh Dam Tailings Dredging

Image

Ok Tedi Tailings Dredging

Image

Ramsgate Baths Beach Nourishment

Image

South Channel Dredging

Image

Tallebudgera Creek Dredging

Image

Swansea Channel Dredging

Image

South Wavebreak Island Channel Dredging

Image

Coomera River Dredging

Image

Caval Ridge Tailings Dredging

Image

Canaipa Passage Channel Dredging

Image

Canaipa Passage Dredging

Image

Cabbage Tree Point Dredging

Image

Bundaberg Port Dredging

Image

Bundaberg Burnett River Dredging

Image

Bulga Mine Dredge Trial

Image

Broadwater Parklands

Image

Bellinger River Resource Dredging

Image

TNRP – Wide Bay Burnett

Image

Kinross Business Park Stage 9