Neumann Dredging’s scope included the dredging of approximately 300,000 m3 from the Gladstone Harbour to clear material for a new tug berth area. The dredging of very hard clays, cobbles, gravel, and coarse river sands from the tug berth area. The material was pumped 1200 meters through a 400mm pipe and a booster pump to a stockpile area.


Image
Image

Scope & Solution


Scope of Works

Neumann Dredging’s scope included the dredging of approximately 300,000 m3 from the Gladstone Harbour to clear material for a new tug berth area. The dredging of very hard clays, cobbles, gravel, and coarse river sands from the tug berth area. The material was pumped 1200 meters through a 400mm pipe and a booster pump to a stockpile area.

The operation was completed on a 24 hour, seven day week basis.

Innovations

Neumann Contractors experimented with various diameter bucket wheels, positioning cutter teeth for better performance from the dredge and pumps because of the indifference of material types on the project. Reduced discharge pipe to deposit material further away in the fill area—different techniques in batter cutting due to the material types.

How We Delivered


Challenges

  • Weather and sea state conditions.
  • Dredging unpredictable material. Very stiff clays, gravel, cobbles and course river sands.
  • Wear and tear on machinery and equipment.
  • Strict dredging tolerances and program.
  • Dealing with other marine vessels.

Gallery


Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image

Looking Ahead


Neumann Dredging’s scope included the dredging of approximately 300,000 m3 from the Gladstone Harbour to clear material for a new tug berth area. The dredging of very hard clays, cobbles, gravel, and coarse river sands from the tug berth area. The material was pumped 1200 meters through a 400mm pipe and a booster pump to a stockpile area.

Image

Let’s Discuss Your Next Project


VIEW OUR OTHER PROJECTS


Image

Wynnum Road Widening

Image

Wacol Driver Training Facility

Image

Sunshine Coast Motorway Link Road

Image

Southwest 1 and Berrinba Wetlands

Image

Mount Lindesay Highway

Image

Maroochy Boulevard Interchange

Image

Kingscoast Estate Project

Image

Kawana Waters

Image

Kalimna

Image

Hope Island Road Duplication

Image

Exit 54 Pacific Motorway – Abraham Road

Image

Bribie Island Road Duplication

Image

Beenleigh Redland Bay Road Upgrade

Image

Chinderah Bypass Project

Image

Gold Coast Convention Centre

Image

Ernest Henry Mine Tailings Dredging

Image

Lake Illawarra Channel Entrance Dredging

Image

Cadia Gold Mine Tailings Dredging

Image

Moura Mine Tailings Dredging

Image

Penrith Lakes Tailings Dredging

Image

Port Botany Container Terminal

Image

Port Kembla Tug Berth Dredging

Image

Superior Coal Tailings Dredging

Image

Sydney Water Desalination Project

Image

Tallebudgera & Currumbin Creeks Dredging

Image

Townsville Marine Project

Image

Corridor Sands Resource Dredging

Image

Corrie Channel Dredging

Image

Cullen Bay – Bhagwan Marine

Image

Currumbin Creek Annual Dredging

Image

Liddell Power Station Fly Ash Dredging

Image

Hellyer Gold Dredge Hire

Image

High Quality Sands – Coffs Harbour

Image

Iluka Boat Harbour Dredging

Image

Cudgen Lakes Resource Dredging

Image

Liddell Bottom Ash Dredging

Image

Maroochy Dredging Beach Nourishment

Image

Maroochy Replenishment Dredging

Image

Monreagh Dam Tailings Dredging

Image

Ok Tedi Tailings Dredging

Image

Ramsgate Baths Beach Nourishment

Image

South Channel Dredging

Image

Tallebudgera Creek Dredging

Image

Swansea Channel Dredging

Image

South Wavebreak Island Channel Dredging

Image

Coomera River Dredging

Image

Caval Ridge Tailings Dredging

Image

Canaipa Passage Channel Dredging

Image

Canaipa Passage Dredging

Image

Cabbage Tree Point Dredging

Image

Bundaberg Port Dredging

Image

Bundaberg Burnett River Dredging

Image

Bulga Mine Dredge Trial

Image

Broadwater Parklands

Image

Bellinger River Resource Dredging

Image

TNRP – Wide Bay Burnett

Image

Kinross Business Park Stage 9