Project Overview


The contract was for the construction of new service roads alongside the Mt Lindesay Highway in the Munruben-Park Ridge South area. The Mount Lindesay Highway is the key transport corridor between Brisbane and Beaudesert.

The service roads were a precursor to the future four-laning of the Mt Lindesay Highway through this area by closing off all direct access to the highway from private properties and reorganising the flow of traffic between the highway and the local roads network.

In addition to the construction complexities, a single bridge and seven cell box culvert were to be constructed at Norris and Chambers Creeks.  Both areas were identified as environmentally sensitive and therefore involve increased environmental risk depending on the time and/or activity.


Image
Image

Scope & Solution


Scope of Works

  • Clearing, Grubbing and Topsoil Strip,
  • Removal and demolition of various drainage structures,
  • Removal and demolition of concrete kerb and channel,
  • Installation of approximately 988 metres of pipe and box culverts,
  • Installation of approximately 2,570 metres of subsoil drains,
  • Construction of a two lane Service Road on the eastern side of Mount Lindesay Highway between Cooreen Road and Chambers Flat Road including a single bridge over Norris Creek,
  • Construction of a two lane Service Road on the western side of Mount Lindesay Highway between Stoney Camp Road and Kensington Drive,
  • Approximately 28,000m3 of road excavation and 32,500m3 of road embankment,
  • Approximately 19,500m3 pavements,
  • Approximately 3,700 tonnes of asphalt plus associated sealing works,
  • Road signs and line marking,
  • Landscaping.

How We Delivered


Challenges

  • Some of the challenges met during construction of the Service Roads included the following,
  • Construction of a seven cell box culvert in the environmentally sensitive Chambers Creek,
  • Maintaining access to local residents throughout construction of the Service Roads,
  • Achieving project timeframes despite the large volume of unsuitable materials present on site.

Gallery


Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image

Looking Ahead


The project was completed well within the contractual timeframe and with all quality targets achieved.

A good working relationship was maintained throughout the contract between Neumann Contractors, the Department of Main Roads and the Local community.

Image

Let’s Discuss Your Next Project


VIEW OUR OTHER PROJECTS


Image

Wynnum Road Widening

Image

Wacol Driver Training Facility

Image

Sunshine Coast Motorway Link Road

Image

Southwest 1 and Berrinba Wetlands

Image

Maroochy Boulevard Interchange

Image

Kingscoast Estate Project

Image

Kawana Waters

Image

Kalimna

Image

Hope Island Road Duplication

Image

Exit 54 Pacific Motorway – Abraham Road

Image

Bribie Island Road Duplication

Image

Beenleigh Redland Bay Road Upgrade

Image

Chinderah Bypass Project

Image

Gold Coast Convention Centre

Image

Ernest Henry Mine Tailings Dredging

Image

Lake Illawarra Channel Entrance Dredging

Image

Cadia Gold Mine Tailings Dredging

Image

Moura Mine Tailings Dredging

Image

Penrith Lakes Tailings Dredging

Image

Port Botany Container Terminal

Image

Port Kembla Tug Berth Dredging

Image

Superior Coal Tailings Dredging

Image

Sydney Water Desalination Project

Image

GPC – Tug Berth & Channel Dredging

Image

Tallebudgera & Currumbin Creeks Dredging

Image

Townsville Marine Project

Image

Corridor Sands Resource Dredging

Image

Corrie Channel Dredging

Image

Cullen Bay – Bhagwan Marine

Image

Currumbin Creek Annual Dredging

Image

Liddell Power Station Fly Ash Dredging

Image

Hellyer Gold Dredge Hire

Image

High Quality Sands – Coffs Harbour

Image

Iluka Boat Harbour Dredging

Image

Cudgen Lakes Resource Dredging

Image

Liddell Bottom Ash Dredging

Image

Maroochy Dredging Beach Nourishment

Image

Maroochy Replenishment Dredging

Image

Monreagh Dam Tailings Dredging

Image

Ok Tedi Tailings Dredging

Image

Ramsgate Baths Beach Nourishment

Image

South Channel Dredging

Image

Tallebudgera Creek Dredging

Image

Swansea Channel Dredging

Image

South Wavebreak Island Channel Dredging

Image

Coomera River Dredging

Image

Caval Ridge Tailings Dredging

Image

Canaipa Passage Channel Dredging

Image

Canaipa Passage Dredging

Image

Cabbage Tree Point Dredging

Image

Bundaberg Port Dredging

Image

Bundaberg Burnett River Dredging

Image

Bulga Mine Dredge Trial

Image

Broadwater Parklands

Image

Bellinger River Resource Dredging

Image

TNRP – Wide Bay Burnett

Image

Kinross Business Park Stage 9