Project


Coomera River Dredging

Client:

Synergy Resource Management

Location:

Coomera, Gold Coast

Completion:

Project Overview


Synergy Resource Management engaged Neumann Dredging to undertake the dredging of the upper sections of the Coomera River. The dredging involved removing 40,000 cubic metres of marine sediments of various depths from an area covering 5.4 kilometres of the Coomera River upstream of Sanctuary Cove.


Image
Image

Scope & Solution


Scope of Works

The sediments were transferred to the newly constructed Coomera Dredge Sediment Management Facility for the Gold Coast Waterways Authority. The facility contains a sedimentation pond and drying area used for dewatering sediment for transport offsite for beneficial reuse or disposal.

Neumann Dredging undertook the dredging using the Neumann designed and built 450mm bucketwheel cutter suction dredge the Nu-Endeavour. A total of 5.5 km of 280mm poly pipeline was utilised along with a single land-based booster station and two floating booster stations to achieve the maximum pumping distance of 5.1km.

How We Delivered


Outcome

The dredging was completed on time and within budget with no environmental or safety incidents occurring.

The Nu Endeavour has also worked on the following projects:

  • Townsville Marine Project,
  • Bundaberg Burnett River Dredging,
  • Bundaberg Port Dredging,
  • GPC – Tug Berth & Channel Dredging,
  • Sydney Water Desalination Project,
  • Penrith Lakes – Tailings Dredging,
  • Maroochy Replenishment Dredging.

Gallery


Image
Image
Image
Image
Image

Looking Ahead


Synergy Resource Management engaged Neumann Dredging to undertake the dredging of the upper sections of the Coomera River. The dredging involved removing 40,000 cubic metres of marine sediments of various depths from an area covering 5.4 kilometres of the Coomera River upstream of Sanctuary Cove.

Image

Let’s Discuss Your Next Project


VIEW OUR OTHER PROJECTS


Image

Wynnum Road Widening

Image

Wacol Driver Training Facility

Image

Sunshine Coast Motorway Link Road

Image

Southwest 1 and Berrinba Wetlands

Image

Mount Lindesay Highway

Image

Maroochy Boulevard Interchange

Image

Kingscoast Estate Project

Image

Kawana Waters

Image

Kalimna

Image

Hope Island Road Duplication

Image

Exit 54 Pacific Motorway – Abraham Road

Image

Bribie Island Road Duplication

Image

Beenleigh Redland Bay Road Upgrade

Image

Chinderah Bypass Project

Image

Gold Coast Convention Centre

Image

Ernest Henry Mine Tailings Dredging

Image

Lake Illawarra Channel Entrance Dredging

Image

Cadia Gold Mine Tailings Dredging

Image

Moura Mine Tailings Dredging

Image

Penrith Lakes Tailings Dredging

Image

Port Botany Container Terminal

Image

Port Kembla Tug Berth Dredging

Image

Superior Coal Tailings Dredging

Image

Sydney Water Desalination Project

Image

GPC – Tug Berth & Channel Dredging

Image

Tallebudgera & Currumbin Creeks Dredging

Image

Townsville Marine Project

Image

Corridor Sands Resource Dredging

Image

Corrie Channel Dredging

Image

Cullen Bay – Bhagwan Marine

Image

Currumbin Creek Annual Dredging

Image

Liddell Power Station Fly Ash Dredging

Image

Hellyer Gold Dredge Hire

Image

High Quality Sands – Coffs Harbour

Image

Iluka Boat Harbour Dredging

Image

Cudgen Lakes Resource Dredging

Image

Liddell Bottom Ash Dredging

Image

Maroochy Dredging Beach Nourishment

Image

Maroochy Replenishment Dredging

Image

Monreagh Dam Tailings Dredging

Image

Ok Tedi Tailings Dredging

Image

Ramsgate Baths Beach Nourishment

Image

South Channel Dredging

Image

Tallebudgera Creek Dredging

Image

Swansea Channel Dredging

Image

South Wavebreak Island Channel Dredging

Image

Caval Ridge Tailings Dredging

Image

Canaipa Passage Channel Dredging

Image

Canaipa Passage Dredging

Image

Cabbage Tree Point Dredging

Image

Bundaberg Port Dredging

Image

Bundaberg Burnett River Dredging

Image

Bulga Mine Dredge Trial

Image

Broadwater Parklands

Image

Bellinger River Resource Dredging

Image

TNRP – Wide Bay Burnett

Image

Kinross Business Park Stage 9