Project Overview


As a result of monsoonal rain and numerous tropical cyclones across some areas of Queensland, the Department of Transport and Main Roads, road network sustained an unprecedented level of damage. This damage was further exacerbated and extended by the following years’  flood events.

The Transport Network Reconstruction Program in the Wide Bay Burnett Region included reconstruction works in the Fraser Coast area surrounding the towns of Hervey Bay, Rainbow Beach and Maryborough.

Contract WBYD1009 or TNRP Fraser Coast Package B was awarded to Neumann Contractors. The original scope of the can be summarised as 33.2 kilometres of Road reconstruction with an initial contract value of $26 million dollars.  By completion there was in excess of 60 kilometres of road rehabilitated with a final contract value of $60 million dollars.


Image
Image

Scope & Solution


Scope of Works

The scope of work included:

  • Total of 60 kilometres of Pavement Repairs,
  • 42 kilometres of in situ cement modification,
  • 4.5 kilometres of unbound pavement overlay,
  • 7.0 kilometres of AC inlay/overlay,
  • Culvert repairs and extensions,
  • 0.5 kilometres of full batter and pavement reconstruction.

Challenges

The most significant challenges were:

  • Reconstructing pavements under live traffic,
  • Maintaining minimum traffic lanes after hours,
  • Managing constant changes to the scope of works.

How We Delivered


Outcome

TNRP Package B was completed over a period of 2.5 years. The relationship with the Client and delegates was excellent throughout the project. The major outcome from the project include:

  • Only a single 720 metre section required re-working,
  • On only 4 occasions did the primerseal require any significant rectification work,
  • 35.5km of road had been re-constructed when the Australia Day 2013 flood event struck. Only two isolated sections of pavement sustained damage,
  • No Lost Time Injuries recorded,
  • There were no incidents of any significance involving the general motoring public.

Gallery


Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image

Looking Ahead


Contract WBYD1009 or TNRP Fraser Coast Package B was awarded to Neumann Contractors. The original scope of the can be summarised as 33.2 kilometres of Road reconstruction with an initial contract value of $26 million dollars.  By completion there was in excess of 60 kilometres of road rehabilitated with a final contract value of $60 million dollars.

Image

Let’s Discuss Your Next Project


VIEW OUR OTHER PROJECTS


Image

Wynnum Road Widening

Image

Wacol Driver Training Facility

Image

Sunshine Coast Motorway Link Road

Image

Southwest 1 and Berrinba Wetlands

Image

Mount Lindesay Highway

Image

Maroochy Boulevard Interchange

Image

Kingscoast Estate Project

Image

Kawana Waters

Image

Kalimna

Image

Hope Island Road Duplication

Image

Exit 54 Pacific Motorway – Abraham Road

Image

Bribie Island Road Duplication

Image

Beenleigh Redland Bay Road Upgrade

Image

Chinderah Bypass Project

Image

Gold Coast Convention Centre

Image

Ernest Henry Mine Tailings Dredging

Image

Lake Illawarra Channel Entrance Dredging

Image

Cadia Gold Mine Tailings Dredging

Image

Moura Mine Tailings Dredging

Image

Penrith Lakes Tailings Dredging

Image

Port Botany Container Terminal

Image

Port Kembla Tug Berth Dredging

Image

Superior Coal Tailings Dredging

Image

Sydney Water Desalination Project

Image

GPC – Tug Berth & Channel Dredging

Image

Tallebudgera & Currumbin Creeks Dredging

Image

Townsville Marine Project

Image

Corridor Sands Resource Dredging

Image

Corrie Channel Dredging

Image

Cullen Bay – Bhagwan Marine

Image

Currumbin Creek Annual Dredging

Image

Liddell Power Station Fly Ash Dredging

Image

Hellyer Gold Dredge Hire

Image

High Quality Sands – Coffs Harbour

Image

Iluka Boat Harbour Dredging

Image

Cudgen Lakes Resource Dredging

Image

Liddell Bottom Ash Dredging

Image

Maroochy Dredging Beach Nourishment

Image

Maroochy Replenishment Dredging

Image

Monreagh Dam Tailings Dredging

Image

Ok Tedi Tailings Dredging

Image

Ramsgate Baths Beach Nourishment

Image

South Channel Dredging

Image

Tallebudgera Creek Dredging

Image

Swansea Channel Dredging

Image

South Wavebreak Island Channel Dredging

Image

Coomera River Dredging

Image

Caval Ridge Tailings Dredging

Image

Canaipa Passage Channel Dredging

Image

Canaipa Passage Dredging

Image

Cabbage Tree Point Dredging

Image

Bundaberg Port Dredging

Image

Bundaberg Burnett River Dredging

Image

Bulga Mine Dredge Trial

Image

Broadwater Parklands

Image

Bellinger River Resource Dredging

Image

Kinross Business Park Stage 9