Corrie Channel Dredging and Beach Nourishment Ready to Start The Corrie Channel is situated at the confluence between the Lower Myall River and Port Stephens Estuary on the north-western side of Corrie Island. The required dredge site itself is located approximately 2km from the town of Tea Gardens and approximately 4km from Hawks Nest. The Corrie Channel is the designated (NSW Maritime) navigation channel/ route between Port …
Gold Coast Dredging Starts Soon
South Channel and South Wavebreak Island Channel Dredging to commence soon! Neumann Contractors have been awarded the dredging contract for South Channel and South Wavebreak Island Channel Dredging 2016 project, on the Gold Coast, Queensland. The works involve the dredging the nominated shallow areas of the primary South Navigation Channel and the secondary South Wavebreak Island Channel. There is a total of 42,400m3 to be …
Maroochy Dredging – Completed
Maroochy Foreshore Replenishment Dredging 2016 Works All Wrapped Up The Maroochy River dredging and the associated beach nourishment works for 2016 has been successfully completed by Neumann Dredging. The works involved the dredging of 20,000m3 of clean sand from the Maroochy River and transferring the material through a permanent pipeline to the beach between Maroochydore SLSC and Alexandra Headland SLSC. The Australian Surf Life Saving Championships event is returning to the Sunshine Coast …
Tallebudgera Dredging Ready to Start
The annual dredging program for Tallebudgera Creek is about to commence. The cutter suction dredge, the Nu Enterprise has been seatowed from the Broadwater and will start dredging soon. This year an estimated 20,000m3 of clean sand will be dredged from Tallebudgera Creek and pumped up to 1.8 kms onto the beach at Palm Beach for much welcome beach nourishment. Neumann Dredging …
2016 Tallebudgera Dredging Completed
Annual Dredging and Beach Nourishment Works Completed for 2016 Neumann Contractors have completed the dredging works in Tallebudgera Creek for 2016. This year over 30,000 m3 of clean sand was dredged from the Tallebudgera Creek to replenish the sand on Burleigh Beach. The sand is pumped overland and released in the southern end of Burleigh Beach, near the Burleigh Beach Pavilion and …
Cabbage Tree Point Begins
Cabbage Tree Point Dredging and Beach Nourishment 2016 Dredging has commenced in the Main Channel North at Cabbage Tree Point. Approximately 15,700m3 of material will be dredged from the channel to a designed depth of -2.7m LAT. The sand will be placed on the foreshore at Cabbage Tree Point, adjacent to the channel. The Cabbage Tree Point dredge site is located on the Main …
Tailings Dredging at Mine Sites
Neumann Dredging has extensive experience in tailings dredging, having worked with various mine sites around the world.
Closed Circuit Hydraulic Oil Tank
Definitions of open loop circuit and closed loop circuit, their respective advantages and disadvantages in hydraulic systems.
Talle’ Creek Dredging Begins
Gold Coast Mayor Tom Tate talks to Ian Bruhl regarding annual dredging works in Tallebudgera Creek and the replenishment of Burleigh Beach.
Beach Nourishment Finished
Neumann Dredging successfully finishes beach nourishment project at Ramsgate Baths, Dolls Point for Bayside Council.





