Project


Caval Ridge Tailings Dredging

Client:

BHP Billiton Mitsubishi Alliance

Location:

Moranbah, Queensland

Completion:

Project Overview


BMA contracted Neumann Dredging to remove 475,00m3 of mud from the floor of an open cut coal mine as part of the preparation for reopening the pit.

Silt and sediment have accumulated on the pit floor. The task was to dredge this mud and pump it out of the pit for placement in an adjacent excavation.

The 450mm bucketwheel cutter suction dredge Nu Bounty was mobilised for this project along with a booster station and 2500m of pipeline. We transferred water back from the discharge area using a return water pump and pipeline to enable an orderly drawdown of the water level in the dredge pond.

All equipment was diesel-powered.


Image
Image

Scope & Solution


Innovations

  • Management of pumping through a 40m vertical pipe section to the booster pump located on the cast bench,
  • Trialling of a discharge restriction valve to manage pressure at the discharge line highpoint while maximising the siphoning effect.

How We Delivered


Challenges

  • The draw-down of the water levels had to be carefully managed to maintain the pit’s geotechnical slope stability.
  • Strict design cut conformance was managed and reviewed using onboard RTK navigations systems,
  • Dredging was carried out on a 24/7 basis to expedite the works.

Gallery


Image
Image
Image
Image
Image
Image

Looking Ahead


The 450mm bucketwheel cutter suction dredge Nu Bounty was mobilised for this project along with a booster station and 2500m of pipeline. We transferred water back from the discharge area using a return water pump and pipeline to enable an orderly drawdown of the water level in the dredge pond.

Image

Let’s Discuss Your Next Project


VIEW OUR OTHER PROJECTS


Image

Wynnum Road Widening

Image

Wacol Driver Training Facility

Image

Sunshine Coast Motorway Link Road

Image

Southwest 1 and Berrinba Wetlands

Image

Mount Lindesay Highway

Image

Maroochy Boulevard Interchange

Image

Kingscoast Estate Project

Image

Kawana Waters

Image

Kalimna

Image

Hope Island Road Duplication

Image

Exit 54 Pacific Motorway – Abraham Road

Image

Bribie Island Road Duplication

Image

Beenleigh Redland Bay Road Upgrade

Image

Chinderah Bypass Project

Image

Gold Coast Convention Centre

Image

Ernest Henry Mine Tailings Dredging

Image

Lake Illawarra Channel Entrance Dredging

Image

Cadia Gold Mine Tailings Dredging

Image

Moura Mine Tailings Dredging

Image

Penrith Lakes Tailings Dredging

Image

Port Botany Container Terminal

Image

Port Kembla Tug Berth Dredging

Image

Superior Coal Tailings Dredging

Image

Sydney Water Desalination Project

Image

GPC – Tug Berth & Channel Dredging

Image

Tallebudgera & Currumbin Creeks Dredging

Image

Townsville Marine Project

Image

Corridor Sands Resource Dredging

Image

Corrie Channel Dredging

Image

Cullen Bay – Bhagwan Marine

Image

Currumbin Creek Annual Dredging

Image

Liddell Power Station Fly Ash Dredging

Image

Hellyer Gold Dredge Hire

Image

High Quality Sands – Coffs Harbour

Image

Iluka Boat Harbour Dredging

Image

Cudgen Lakes Resource Dredging

Image

Liddell Bottom Ash Dredging

Image

Maroochy Dredging Beach Nourishment

Image

Maroochy Replenishment Dredging

Image

Monreagh Dam Tailings Dredging

Image

Ok Tedi Tailings Dredging

Image

Ramsgate Baths Beach Nourishment

Image

South Channel Dredging

Image

Tallebudgera Creek Dredging

Image

Swansea Channel Dredging

Image

South Wavebreak Island Channel Dredging

Image

Coomera River Dredging

Image

Canaipa Passage Channel Dredging

Image

Canaipa Passage Dredging

Image

Cabbage Tree Point Dredging

Image

Bundaberg Port Dredging

Image

Bundaberg Burnett River Dredging

Image

Bulga Mine Dredge Trial

Image

Broadwater Parklands

Image

Bellinger River Resource Dredging

Image

TNRP – Wide Bay Burnett

Image

Kinross Business Park Stage 9